Iron Hill Brewery & Restaurant
West Chester Restaurant
10,000
Media Restaurant
9,500
Newark,
Delaware

The
projects consisted of a total renovation of an existing
Woolworth's store located in West Chester, PA and renovations
of a former Eckerd's Drug in Media, PA. We were responsible
for the interior renovations and new storefront including the
installation of a "Micro Brewery" and kitchen. The
construction featured a high end millwork package. Total construction took 95 days to complete.
Grace Lutheran Church
7,000
The project consisted of alterations and a
new addition to the existing church located in Hockessin,
Delaware. We were responsible for coordinating the site work as
well as construction of a new atrium and classroom facility. The
project took approximately 160 days to complete.
First National Bank of West Chester
3,400
Renovated 3,400 square feet of the
Pocopson Train Station.
Boomers
Recreation Facility
24,000

The
project consisted of a 24,000 square foot state-of-the-art
sports training facility located in Avondale, Pennsylvania.
The first level has an open area for virtual reality games,
restaurant facility and soft-play area for children. The
facility has a second floor offices overlooking the main area
with both elevator and stair access. The structure of the
building consists of galvanized metal trusses on steel beams
and columns, masonry walls and a standing seam metal roof
system.
Longwood Corporate Center South
104,200

The
project consisted of developing and constructing three class
"A" office buildings with a total of 100,200 square
feet and a 2,000 square foot supporting Day Care Center.
Phase I included developing 10.5
acres and installing all of the infrastructure including
improvements to roadways, sewer lines, utilities, parking lot
lighting, etc. Building "A" consisted of
construction a 46,000 square foot brick veneer and steel
structure building shell and high end interior office fit
outs.
Phase II, which was completed in
November 1997, included a 4,000 square foot Day Care Facility
and a 20,000 square foot office building designed and
constructed similar to Building "A".
Building "C" which is Phase
III of the project began in the spring of 1998 and consists of
a 34,200 square foot office facility mirroring the other
buildings.
Veterinary Specialty Holdings LLC
5,500
The project consisted of development of
the site work; total renovations and a new addition for
veterinary clinic and hospital facilities. The project included
the installation of surgery rooms, laboratory facilities and
kennel areas as required. The project took approximately 140
days to complete.
First National Bank Of West Chester
2,700
The project consisted of a new back branch
facility on an existing pad site at the West Gate Plaza Shopping
Center in Paoli, Pennsylvania. The construction featured the use
of a "Fypon" exterior millwork system, and high-end
interior millwork including custom back teller line.
Longwood Veterinary Center
6,000
The project consisted of developing a site
and new construction for a veterinary clinic and hospital. We
were responsible for coordinating the site work as well as
construction of a new facility including installation of surgery
rooms and kennel area as required. The project took
approximately 150 days to complete.
Kennett Fire Company No. 1
26,500

The original project consisted
of an 11,880 square foot engine room and clubroom
facility constructed of masonry and steel.
Phase II of the construction started
with a 1,188 square foot addition to their existing engine room
and construction of 13,432 square foot banquet hall facility
with a seat capacity up to 450 people. The features of this
facility include vestibule, coatroom, custom bar, and buffet
room along with a 3,000 square foot commercial kitchen. The
interior custom amenities include custom cornice, chairrail,
picture trims and mirrored columns.
Walnut Road Associates
36,800
The project consisted of developing a 5
acre lot in the Walnut Road Industrial Park. Two split-faced
block buildings were constructed for office/warehouse use.
Building No. 2, is a 12,000 square foot office building.
Building No. 1 is a 24,800 square foot flex building.
Jackson Immuno-Research, Inc.
28,000
The original project consisted of 20,000
square feet of offices, research/development and laboratory
facilities. Later, an 8,000 square foot office addition was
completed.
Tri-M Corporation
The initial contract started
with the construction of a 20,000 square foot office
and warehouse facility.
Phase II of the
construction started with a 10,000 square foot
garage/warehouse facility and a 1,000 square foot
office addition.
Phase III of construction started with
renovations to the 10,000 square foot garage/warehouse facility
creating new offices of approximately 3,000 square feet. Also, a
new training room and renovations to existing offices were
completed. The total cost of construction of B.A.S. offices and
shop expansion to the existing facility.
Applebrook Veterinary Center
5,000

Construction of a new veterinary clinic
facility utilizing wood frame construction. The project included
a veterinary clinic with operating room, kennels, X-ray and
offices. This project included seamless flooring systems with
kennel drains at kennels, dark room at X-ray and board and
batten siding to give a country "Barn" effect.
E. I. DuPont deNemours & Company
17,000
Construction of a 17,000 square foot
office and research facility.
Giordano's Restaurant
6,600

Construction of a 6,600 square foot
contemporary 115 patron restaurant and bar facility.
Three Little Bakers
Dinner Theater
35,000
(Formerly
Pike Creek Country Club)
Construction included a 1,000-patron
dinner theater; kitchen/restaurant facility and bake shop
totaling 35,000 square feet.
West Bradford Fire Company
6,800
Construction of a 6,800 square foot
firehouse substation.
Cochranville Fire Company
10,522
The project consisted of a new 3,700
square foot Engine Room addition, 114 square foot radio room
addition and renovations to 6,689 square feet of existing
building including a new commercial kitchen and complete
interior facing to tie into the new addition.
Albert Einstein Academy
9,570
The project consisted of demolishing the
existing classrooms at both the upper and lower levels.
Renovations included relocation of the classrooms, bathrooms,
and administrative offices, as well as the sprinkler system. The
lower level renovations included a custom library, office and
computer room. The work began in June of 1995 and was completed
by the opening of school in September the same year.
C & J Clark America, Inc.
50,000
All work for this project was preformed in
accordance with the National Historic Register Society.
Construction consisted of the following:
1. Exterior and interior
renovations to former boiler room and carriage house to computer
room and general station
2. Exterior renovations to A, B, and C buildings, former
manufacturing and warehouse to corporate area.
3. Construction of G building and interior
renovations to A and C Buildings.
Phase II construction consisted of
renovations to the interior of the second floor of building B.
Total construction, except the mechanical, electrical and
plumbing work.
Phase III construction consisted of
interior renovations to C and third floor of A building. Our work included all
general construction, except the mechanical, electrical and
plumbing work.
Bethlehem United Methodist Church
6,000
The project consisted of Sanctuary
expansion, renovations to the chancel platform and construction
of a 6,000 square foot classroom addition to the Bethlehem
United Methodist Church. Also, an additional classroom was
constructed.